You don't have javascript enabled. Good luck with that.
Pencarian
 Saluran PHB Alu-alu Mulai Dinormalisasi

Alu-alu Connecting Channel Normalized

An Alu-alu connecting channel located in Pulo Gadung Sub-District, East Jakarta begins to be normalized. According to the plan, it is targeted to finish in early December.

Normalization has begun this week. In downstream, the water will be directed to Sunter River

Besides dredging mud, it also includes sheet pile reparation. This way is hoped able to reduce puddles along Jalan Pisangan Lama, Pisangan Timur Urban Village, Pulo Gadung.

Section Head of Water Management for East Jakarta Water Management Sub-Department, Mukhid admitted in last rainy season, the area was inundated up to 20 cm. To solve it, the channel was drained from upstream of Jalan Wisma Jaya to downstream, downstream of Jalan Alu-alu, Jatinegara Kaum, Pulogadung.

Pulogadung PHB Inspection Road Collapsed

β€œNormalization has begun this week. In downstream, the water will be directed to Sunter River,” he said, Friday (9/25).

Due to unfit land using heavy equipment, he furthered, the process would take a long time.

Afterwards, there would be sheet pile reparation. β€œIt is targeted to be complete this early December,” he disclosed.

Linked News
Popular News indeks
  1. Cilandak Drainage Upgraded to Mitigate Flooding

    access_time27-01-2026 remove_red_eye869 personTiyo Surya Sakti
  2. TransJabodetabek Expansion, a Strategic Step to Increase Public Transportation Use

    access_time26-01-2026 remove_red_eye424 personFakhrizal Fakhri
  3. Jakarta Prepares OMC and 200 Excavators to Prevent Flood

    access_time26-01-2026 remove_red_eye371 personDessy Suciati
  4. Jakarta Showers to Make Way for Partly Cloudy Skies

    access_time30-01-2026 remove_red_eye359 personDessy Suciati
  5. Several Microtrans Routes Diverted

    access_time31-01-2026 remove_red_eye358 personAldi Geri Lumban Tobing
close